skip to main | skip to sidebar

Hug Shop Blog

Thursday, April 30, 2009

Sump-in to post

The sump now has all the connections in place.  We need to figure out the floor around it, though, in case of spills during maintenance.

Posted by Ryan at 4:52 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Labels

  • Green Links
  • Staff Development
  • Water Solar Panel

Blog Archive

  • ▼  2009 (58)
    • ►  June (16)
    • ►  May (26)
    • ▼  April (16)
      • Sump-in to post
      • Matthews solar tests
      • Post from phone
      • Different 10/32 fittings
      • Tube fitting test
      • Latest corner test
      • Second corner gluing tests
      • Methane Digester Blueprints
      • RREAL's Back Porch
      • ARC 08 Water Reprocessing
      • Quieter duct conenctors
      • Jeff at the electrical bench
      • Wayne at work
      • Tube gluing test
      • .015 and .030 recessed glue better
      • Corner glue test#1
  • ►  2008 (10)
    • ►  May (10)

Contributors

  • Ed Fasula
  • Hug Shop
  • Paul
  • Ryan