skip to main | skip to sidebar

Hug Shop Blog

Monday, May 4, 2009

Methane tanks started

We started the methane tanks today.  Key features include:
-incoming pass through fitting to avoid spillage
-adjustable float level
-incoming line foot at the bottom with large openings.

Yet to be added is an additional 2 inch port for future use.

Posted by Ryan at 11:21 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Labels

  • Green Links
  • Staff Development
  • Water Solar Panel

Blog Archive

  • ▼  2009 (58)
    • ►  June (16)
    • ▼  May (26)
      • In floor drains in the arc
      • Craig Gilbertson
      • Web enabled logger and controller
      • Solar panel threaded fitting test
      • Another pic
      • Safety presentation
      • ARC-09 Meeting
      • Dug's arc sketch
      • Irrigation parts
      • Movable insulation for windows
      • Window glazing spacings
      • Tensile Ring Keyhole Garden
      • Arc floor drain notes
      • Range hood for old main
      • Temperature control experiments
      • Plumb Crazy
      • Methane tanks
      • Mongolia?
      • Irrigation birdhouses
      • Pictures
      • Latest projects
      • Pictures of siphon maintainer
      • Vacuum assisted siphon for small planting bins
      • Methane tanks started
      • More destruction -minus the mayhem
      • Paul.
    • ►  April (16)
  • ►  2008 (10)
    • ►  May (10)

Contributors

  • Ed Fasula
  • Hug Shop
  • Paul
  • Ryan